EconReads
Donate

Indian Railways: The Economics of a Giant

Vande Bharat and Faster Trains

How India's semi-high-speed Vande Bharat trains were designed and built domestically, what they cost, and the trade-offs of speed on shared tracks.

Vande Bharat trains are India’s domestically built semi-high-speed trains.

Origins

  • The first train, built by the Integral Coach Factory in Chennai, started running in February 2019 between Delhi and Varanasi.
  • Designed in India at a fraction of the cost of imported trains.

Features

  • Self-propelled with no separate locomotive, allowing faster acceleration.
  • Designed for speeds up to 160 to 180 km/h.
  • Comfort features like automatic doors and better seating.
  • Sleeper versions were being developed.

The speed reality

Average speeds on many routes are far below design speeds because:

  • Tracks and signalling limit speed.
  • Trains share lines with slower freight and passenger trains.

Economics

  • Fares are higher than regular trains.
  • Popular routes run full; some routes see lower occupancy.
  • Manufacturing in India builds skills and a potential export product.

The bigger picture

Faster trains need upgraded tracks and separated freight, which is why freight corridors and track work matter.

The morning Vande Bharat

A Vande Bharat cuts travel time between two cities by an hour compared with older trains, though it still can't reach its top speed on the old tracks.

Thinking a fast train alone means fast travel

Tracks, signals and traffic limit actual speeds.

Key takeaways
  • Vande Bharat trains started in February 2019.
  • They were designed and built in India.
  • Actual speeds are limited by tracks and shared traffic.
  • Faster travel needs track, signalling and freight separation.
2 min read

No recording for this one yet - EconReader can read it aloud for you.

Indian Railways: Checkpoint 1 Test yourself with a quick 5-question checkpoint →

Welcome to EconReads

This site is made for visually impaired learners, so our read-aloud reader is already switched on to help you explore hands-free.

You're in control - turn it off any time using the Reader button at the top of the page.

EconReader Ready